Application: | Construction, Mining, quarry |
---|---|
Certification: | CE, ISO |
Crushing Capacity: | 1000-2000t/h |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | Crushing cavity |
Feeding cort(mm) |
Maximum feeding size(mm) |
Minimum CSS(mm) | Capacity(t/h) | Power(kW) | Weight(Motor Excluded kg ) | Dimension(mm) |
GC300S | EC | 380 | 320 | 30 | 220-530 | 250 | 16700 | L2440×D2000×H2660 |
GC500S | EC | 500 | 400 | 45 | 300-870 | 355 | 34400 | L2740×D2600×H3220 |
GC800S | EC | 420 | 350 | 25 | 392-1173 | 560 | 45000 | L3370×D2820×H4010 |
GC1000S | EC | 520 | 428 | 25 | 488-1783 | 750 | 78000 | L3750×D3300×H5200 |
Note: The output is the approximate throughput measured by medium hardness materials. Due to the differences in feed, particle size, rock type and water content of materials, the actual results will be different. |
Model | 25 | 30 | 35 | 40 | 45 | 50 | 55 | 60 | 65 | 70 |
capacity(t/h)CSS(mm) | ||||||||||
GC300S | 220-270 | 255-400 | 290-500 | 320-530 | ||||||
GC500S | 300-470 | 375-670 | 400-750 | 450-800 | 470-870 | |||||
GC800S | 392-466 | 423-663 | 470-790 | 509-856 | 540-905 | 595-1001 | 610-1027 | 650-1127 | 657-1173 | 744-1167 |
GC1000S | 488-566 | 527-781 | 556-1003 | 614-1182 | 673-1295 | 741-1426 | 790-1520 | 839-1614 | 868-1670 | 926-1783 |
1 : Are you original manufacture?
A:Yes. we are NFLG, an official leading manufacture in construction machinery in China.
Core products cover:
A. Asphalt Mixing, Concrete Mixing and Dry Mortar Mixing (Engineering Mixing);
B. Mobile Crusher & Screen, Stationary Crusher & Screen and Sand Making and Shaping Equipment (Materials Processing);
C. Construction Waste Processing Solution, Waste Sludge & Soil Recycling Solution and Decoration Waste Processing Solution(Construction Waste Processing).
2:What kind of payment can be accepted?
A:Normally we can work on T/T term or L/C term.
3:Do you provide equipment operation training?
A:Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training.
4:What about the delivery time?
A:45 days after receving the deposit.
5:What about the warranty time?
A:12 months after shipment.
6.What about the Minimum Order Quantity?
A:The MOQ is 1 pcs.