After-sales Service: | Full Life Cycle Industrial Services |
---|---|
Warranty: | 1 Year |
Type: | Asphalt Mixing Plant |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
LB
Asphalt Mixing Plant with Side-Mounted Storage Bins
Experience the future of construction with our Asphalt Mixing Plant's innovative modular design, ensuring seamless installation and effortless relocation.
Maximize your space efficiency as the equipment's compact form boasts strong site adaptability, perfectly tailored to fit diverse environments.
Achieve outstanding environmental stewardship with our equipment's superior sealing performance, delivering enhanced eco-friendly outcomes.
Model | LB1500 | LB2000 | LB3000 | LB4000 | LB5000 |
Cold material bin:quantity x volume | 4 * 10m³ | 5 * 15m³ | 5 * 20m³ | 6 * 20m³ | 6 * 20m³ |
Dryer dimension: diameter x length | 1.8m * 7.5m | 2.25m * 9m | 2.5m * 10m | 2.8m * 11m | 2.9m * 12.5m |
Dryer maximum capacity(moisture content 5%) | 120t/h | 160t/h | 240t/h | 320t/h | 400t/h |
Fuel | Light oil/ heave oil gas(optional) | ||||
Dust remover | Gravity dust removal + bag filter dust removal | ||||
Mixer capacity | 1.5t | 2t | 3t | 4t | 5t |
Mixing method | Horizontal twin shaft forced mixing | ||||
Finished product bin capacity | 50m³ | 50m³ | 77m³ + 62m³ | 77m³ + 62m³ | 77m³ + 62m³ |
Control system | Cloud interconnection, dual-computer sychronous control system | ||||
Rated capacity | 120t/h | 160t/h | 240t/h | 320t/h | 400t/h |
1 : Are you original manufacture?
A:Yes. we are NFLG, an official leading manufacture in construction machinery in China.
Core products cover:
A. Asphalt Mixing, Concrete Mixing and Dry Mortar Mixing (Engineering Mixing);
B. Mobile Crusher & Screen, Stationary Crusher & Screen and Sand Making and Shaping Equipment (Materials Processing);
C. Construction Waste Processing Solution, Waste Sludge & Soil Recycling Solution and Decoration Waste Processing Solution(Construction Waste Processing).
2:What kind of payment can be accepted?
A:Normally we can work on T/T term or L/C term.
3:Do you provide equipment operation training?
A:Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training.
4:What about the delivery time?
A:45 days after receving the deposit.
5:What about the warranty time?
A:12 months after shipment.
6.What about the Minimum Order Quantity?
A:The MOQ is 1 pcs.